A break on the sensors is planned to group 1 from 20h to 8h daily. We do not want that Switch B pauses. In the settings of switch B The legacy of the group is disabled Schedule = always Dependency type = select an object Dependence = Ping Switch A Despite this configuration switch B had paused. How to Switch B that does not go into break?
Dependence of equipment in a group
Votes:
0
1 Reply
Disclaimer: The information in the Paessler Knowledge Base comes without warranty of any kind. Use at your own risk. Before applying any instructions please exercise proper system administrator housekeeping. You must make sure that a proper backup of all your data is available.
Add comment