The one time maintenance window option in the system today has been a big help for working within Change Control windows, but I have a need for pre-scheduling reoccuring maintenance.
Several of our external vendors have their own maintenance times, which reoccur at the same date/time each week, and I'd like to be able to pre-set that in PRTG. Is there a way to do this? If not, can it be added to a futures list?
Would be a big help. Thanks!
Add comment