What is this?

This knowledgebase contains questions and answers about PRTG Network Monitor and network monitoring in general.

Learn more

PRTG Network Monitor

Intuitive to Use. Easy to manage.
More than 500,000 users rely on Paessler PRTG every day. Find out how you can reduce cost, increase QoS and ease planning, as well.

Free Download

Top Tags


View all Tags

PRTG Ad Sync / Downtimes

Votes:

0

Hello guys

I am in the process of automating the PRTG alerting / maintenance window. We have created 23 groups as timeslots on our Active Directory for each day. These are called "Monday 00" for Monday 00:00; "Monday 02" for Monday 02:00.

Now: Is it possible to link these groups with a PRTG downtime? E.g. If the server "DC21" is member of the group "Monday 02", PRTG will automatically make a downtime for the next first Monday of the month from 02:00-04:00?

If "DC21" is then removed from the group "Monday 02" and added to the group "Tuesday 06", the downtime from Monday 02:00-04:00 should be automatically removed and a downtime for Tuesday 06:00 - 08:00 should be added.

Translated with www.DeepL.com/Translator (free version)

active-directory automation downtime powershell

Created on Apr 30, 2021 8:24:42 AM



1 Reply

Votes:

0

Hello,

I'm afraid something like this is not possible; at least not without writing custom scripts. Maybe this article might be of interest for you.

Created on May 4, 2021 12:27:37 PM by  Timo Dambach [Paessler Support]




Disclaimer: The information in the Paessler Knowledge Base comes without warranty of any kind. Use at your own risk. Before applying any instructions please exercise proper system administrator housekeeping. You must make sure that a proper backup of all your data is available.