I need to migrate my PRTG master server (Windows server 2012) to another new server (Windows server 2022).
My architecture:
- PRTG master server with Windows server 2012, more than 500 sensors.
- 1 remote probe with Windows server 2022 server and,
- A second remote probe with windows server 2016.
What's the best way to do the migration?
Thanks in advance. Leo
Add comment